New building extension of existing cultural centre with a theatre hall.
The fixed stand can be extended to the fixed stage by means of a retractable stand on the orchestra lift.
Client
Municipality of Heist-op-den-Berg
Designer / Architect
PLANNERS architects
Location
Heist-op-den-Berg
Budget theatre consulting
1.090.000 € (excl. VAT)
Period
Study:
2006 - 2011
Intervention:
Scenography
Functional organisation chart
Design of stage and auditorium
Study of various technical theatre equipment